Our Work

The work speaks. Here's some of it.

Every project below is a real job, photographed as it was finished. We're adding the detail behind each one — what the client wanted, what we found once we opened things up, how long it took — and new projects go up as we complete them.

Bathroom with a glass-panelled walk-in shower on the left and a two-sink wood vanity with a lit mirror on the right.
Bathroom remodeling

Primary bathroom

May 2026

A walk-in shower behind frameless glass, a fluted wood-toned feature wall, pebble shower floor, and a two-sink vanity under a lit mirror.

Bathroom with a walnut vanity and white quartz top in the foreground, tiled tub and shower beyond, and a round mirror on the left.
Bathroom remodeling

Full bathroom remodel

June 2026

Tub and shower tiled to the ceiling, a stone-tile wainscot carried around the room, a walnut vanity with a quartz top, and matte black fittings throughout.

Shower under a sloped attic ceiling with a frameless glass door, white tile walls, and a black-and-white hexagon mosaic floor.
Bathroom remodeling

Attic bathroom

April 2026

A bathroom fitted into a sloped attic space — a glass-door shower tucked under the roofline, white tile with a hexagon mosaic pan, and slate-toned floor tile.

Curved oak staircase with white risers, white turned balusters, and an oak handrail curling into a volute at the bottom.
General carpentry & repairs

Oak staircase

July 2026

Oak treads and a turned-baluster railing on a curved run, finished with a volute at the bottom newel.

Want yours on this page?

Talk to the owner, not a bot — you'll hear from Luca himself, usually the same day.